Bakhvi 3 HPP- Rehabilition works


Portfolio of hydro technical direction of "Element Construction" is very loaded.Our successfully completed projects are: kintrishi and avani hydro power plants.

Now, we introduce you, bakhvi 3 HPP rehabilition  works.

We've Completed:
  • Header pool building fortification, By arranging reinforced-concrete trimmings and retaining walls.
  • We arranged 3 different at the site waterfalls system.
  • On the territory of HPP, arranged drainage system.
  • This time, fortification of the mountain slope, we used wall of gabions.

Client: LTD “Bakhvi hydro power”.

Location: Ozurgeti, Guria, Georgia.

Status: Completed