N1 industrial construction company Element Construction is
continuing working on the pharmaceutical logistic center.
The load-bearing frame of the building is combined, made of monolithic reinforced concrete and steel structures. The industrial construction is being implementing in Tbilisi on the territory of 5 000 sq.m. At this stage, structural steel is being installed on the object.
After commissioning, the center will be operated by Pharma Solution Ltd.