Element Construction continues building of logistic center


N1 industrial construction company Element Construction is continuing working on the pharmaceutical logistic center.

The load-bearing frame of the building is combined, made of monolithic reinforced concrete and steel structures. The industrial construction is being implementing in Tbilisi on the territory of 5 000 sq.m. At this stage, structural steel is being installed on the object.

After commissioning, the center will be operated by Pharma Solution Ltd.

12.11.2021