Portfolio of hydro technical direction of "Element Construction" is very loaded.Our successfully completed projects are: kintrishi and avani hydro power plants.
Now, we introduce you, bakhvi 3 HPP rehabilition works.
We've Completed:
- Header pool building fortification, By arranging reinforced-concrete trimmings and retaining walls.
- We arranged 3 different at the site waterfalls system.
- On the territory of HPP, arranged drainage system.
- This time, fortification of the mountain slope, we used wall of gabions.
Client: LTD “Bakhvi hydro power”.
Location: Ozurgeti, Guria, Georgia.
Status: Completed